七七久久,亚洲b在线,一二三四五在线视频,男人扒开女人添高潮的av

網(wǎng)站公告-NOTICE
航豐實業(yè)·產(chǎn)品分類
聯(lián)系我們
濟南航豐實業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://m.afrolucha.com  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

電纜橋架的支、吊架的配置要求

水平敷設(shè)時,支架間距一般不應(yīng)大于2000mm。

When laying horizontally, the spacing between supports should generally not exceed 2000mm.

彎頭附近應(yīng)增設(shè)支架,彎頭半徑小于300mm時,應(yīng)在彎頭兩端各300-600mm處設(shè)置一個支架。

A bracket should be added near the elbow. When the radius of the elbow is less than 300mm, a bracket should be set at 300-600mm at each end of the elbow.

02

垂直單層敷設(shè)時,支架間距不應(yīng)超過2000mm。多層時應(yīng)通過計算確定。

When laying vertically in a single layer, the spacing between supports should not exceed 2000mm. When there are multiple layers, they should be determined through calculation.

立柱應(yīng)與托盤、梯架層間距離相適應(yīng),以便多層布置。

The distance between the columns and the pallets and ladder layers should be suitable for multi-layer layout.

吊桿不應(yīng)使用小于10mm的圓鋼,應(yīng)有防晃措施,端部應(yīng)有固定措施。

The suspension rod should not use round steel smaller than 10mm, and anti sway measures should be taken. The end should have fixing measures.

豎井內(nèi)敷設(shè)時,每3-5層設(shè)置一個承重支架,不應(yīng)安裝在固定電纜的橫擔(dān)上。

When laying in the vertical shaft, a load-bearing bracket should be installed every 3-5 layers and should not be installed on the cross arm of the fixed cable.

固定支架與預(yù)埋件焊接時,焊縫應(yīng)滿足質(zhì)量要求,長度不應(yīng)少于25mm。

When welding fixed brackets and embedded parts, the weld seam should meet quality requirements and the length should not be less than 25mm.

使用膨脹螺栓時應(yīng)符合相關(guān)標(biāo)準(zhǔn)規(guī)定。

The use of expansion bolts should comply with relevant standards and regulations.

支架安裝應(yīng)垂直、無明顯扭曲,高度誤差不超過公差要求。

The bracket installation should be vertical, without obvious distortion, and the height error should not exceed the tolerance requirements.

支架的設(shè)計和安裝應(yīng)滿足其強度、剛度和穩(wěn)定性的要求。

The design and installation of the bracket should meet its requirements for strength, stiffness, and stability.

主體鋼結(jié)構(gòu)上不得焊接支、吊架,應(yīng)征得結(jié)構(gòu)許可。

Welding of supports and hangers is not allowed on the main steel structure, and a structural professional permit must be obtained.

支、吊架的設(shè)計應(yīng)根據(jù)托盤、梯架的規(guī)格、層數(shù)、跨距等條件進行配置,并滿足載荷要求。

The design of supports and hangers should be configured according to the specifications, number of layers, span, and other conditions of pallets and ladders, and meet the load requirements.

托臂的開孔位置應(yīng)協(xié)調(diào)層間距離的要求。立柱可預(yù)留可調(diào)節(jié)的長孔。

The opening position of the support arm should be coordinated with the requirements of interlayer distance. The column can reserve adjustable long holes.

支、吊架的規(guī)格和型號應(yīng)在滿足載荷條件下,根據(jù)項目的實際情況選擇。

The specifications and models of supports and hangers should be selected according to the actual situation of the project while meeting the load conditions.

金屬支、吊架應(yīng)進行防腐處理,特別是戶外和潮濕環(huán)境的。

Metal supports and hangers should undergo anti-corrosion treatment, especially in outdoor and humid environments.

支、吊架的設(shè)計計算和試驗應(yīng)驗證其滿足強度、剛度和穩(wěn)定性要求。

The design calculation and testing of supports and hangers should verify that they meet the requirements of strength, stiffness, and stability.

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
精品少妇| 糖心VLOG精品一区二区| 欧美性爱第一区| 色哟哟精品视频| 亚洲 综合 欧美 自拍| 在线播放网站你懂得| 清清草原免费视频97| 欧美一本日本进入| 伊人网av| 真实的单亲乱对白| 中文欧美国产| 草草影院网址| 国内精品久久久久久不卡影院| 国产精品久久久毛片| 欧美日韩一区久久| 99亚洲精品| 亚洲国产成人久久一区| 国产剧情日韩在线视频| 午夜激情网址| 国产操美女| 精品少妇人妻av免费久久农村| 人妻偷情自拍| 日韩区av在线| 亚洲AV综合一区二区| 亚洲色图四区| 青州市区号是多少| 日韩346av| 日韩无码一区分类| 99久久99久久精品| 日韩精品免费无码专区| 中文字幕无线码一区二区 | 亚洲成人欧美日韩| 亚洲综合视频精品| 蜜臀av.com| 欧日韩人妻| 99久久国产综合精品麻豆| 日本h动漫动态图| 兴宁市| 亚洲欧美日韩综合国产| 亚洲日韩天堂av| 日本乱人伦a精品|