七七久久,亚洲b在线,一二三四五在线视频,男人扒开女人添高潮的av

網(wǎng)站公告-NOTICE
航豐實業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://m.afrolucha.com  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

濟(jì)南電纜橋架: 橋架間距應(yīng)該如何設(shè)置?

  電纜橋架水平安裝時,支吊架之間距離適合在1.5米~2米,在轉(zhuǎn)彎處的支吊架間距應(yīng)為0.3米~0.6米,垂直安裝電纜橋架時,支吊架間的距離不應(yīng)該超過2米。下面由濟(jì)南航豐實業(yè)的小編給大家介紹一下安裝電纜橋架間距要求的相關(guān)內(nèi)容。

When installing cable trays horizontally, the distance between supports and hangers should be suitable between 1.5 to 2 meters. The distance between supports and hangers at turns should be between 0.3 to 0.6 meters. When installing cable trays vertically, the distance between supports and hangers should not exceed 2 meters. Below, the editor from Jinan Hangfeng Industry will introduce the relevant content on the spacing requirements for installing cable trays.

  電纜橋架與一般工藝管道平行鋪設(shè)時,敷設(shè)間隔少400毫米,與工藝管道交叉敷設(shè)時,安裝間距小為300毫米,電纜橋架與腐蝕氣體管道的平行間距少為500毫米,交叉間距小為500毫米。電纜橋架水平安裝時,應(yīng)該按照載荷規(guī)范選擇支、吊架間距,距離不應(yīng)該大于2米。電纜橋架支、吊架的間距也要參考其產(chǎn)品性能參數(shù)說明來設(shè)置。

When the cable tray is laid parallel to the general process pipeline, the laying interval should be at least 400 millimeters. When cross laid with the process pipeline, the installation interval should be at least 300 millimeters. The parallel spacing between the cable tray and the corrosive gas pipeline should be at least 500 millimeters, and the cross spacing should be at least 500 millimeters. When installing cable trays horizontally, the spacing between supports and hangers should be selected according to the load specifications, and the optimal distance should not exceed 2 meters. The spacing between cable tray supports and hangers should also be set according to the product performance parameter specifications.

20210330042649173.png

  單層電纜橋架安裝時,配套支吊架的間距不應(yīng)該大于2米,電纜橋架多層同時敷設(shè)時,支吊架之間的距離應(yīng)該根據(jù)載荷進(jìn)行具體計算。電纜橋架與無保溫的熱力管道水平敷設(shè)時,平行間距少為1米,交叉鋪設(shè)時的小間距應(yīng)為0.5米,電纜橋架與有保溫措施的熱力管道交叉敷設(shè)時距離小為300毫米,水平鋪設(shè)時距離少為500毫米。

When installing single-layer cable trays, the spacing between supporting brackets should not exceed 2 meters. When laying multiple layers of cable trays simultaneously, the distance between brackets should be calculated specifically based on the load. When cable trays are horizontally laid with uninsulated thermal pipelines, the parallel spacing should be at least 1 meter, and the minimum spacing when cross laid should be 0.5 meters. When cable trays are cross laid with insulated thermal pipelines, the minimum distance is 300 millimeters, and when horizontally laid, the distance is at least 500 millimeters.

  本文由 濟(jì)南電纜橋架 友情奉獻(xiàn)。更多有關(guān)的知識請點擊: http://m.afrolucha.com 真誠的態(tài)度,為您提供為的服務(wù)。更多有關(guān)的知識我們將會陸續(xù)向大家奉獻(xiàn),敬請期待。

This article is dedicated to the friendship of Jinan cable tray. For more information, please click on: http://m.afrolucha.com Sincere attitude, providing you with comprehensive service. We will gradually contribute more relevant knowledge to everyone, please stay tuned.

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
欧美精品色呦呦| 97视频国产| chao peng超碰| 九九久久在线看| 久久久夜夜嗨| 色窝窝一区二区三区成人网| 亚洲 无码 高清视频| 国产精品人人做人人操| 二区播放| 国产美女牲交视频| 日韩无码不卡视| 亚洲AV无码久久久久网站蜜桃 | 免费-午夜AV| 国产成人亚洲欧美一区,| 日日干日日干| ysl热门蜜桃色88| 亚洲精品乱码久久久久蜜桃| 日韩中文欧美| 亚洲成人久久打桩机| 精品午夜视频网| 青青在线视频人视频在线| 丁香五月国产欧美| 贺州市| 一本久日本久| www亚洲天堂| 日韩精品一区二区三区在线观看| 国产99视频精品免费观看9| 欧美一区二区三区在线视频观看| 国产精品无码久久综合| 精品国产aⅴ麻豆| 亚洲av免费| 在线精品精| 免费你懂的视频| 久久久精品人妻一区二区三区四| 在线亚洲AV成人无码| 亚洲 欧美 另类 日韩| 九九99亚洲一区二区| 亚洲国产成在人网站天堂| 亚洲一区二区三区精品蜜桃久久| 欧美亚洲天堂综合啪啪| 九九精品|