七七久久,亚洲b在线,一二三四五在线视频,男人扒开女人添高潮的av

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://m.afrolucha.com  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

電纜橋架的施工需要根據(jù)要求進(jìn)行!

電纜橋架是一種用于電纜敷設(shè)的支撐結(jié)構(gòu),它可以把電纜支撐起來并使它們保持在合適的位置。以下是山東電纜橋架的施工步驟:
Cable tray is a supporting structure for cable laying, which can support cables and keep them in proper position. The following are the construction steps of cable tray in Shandong:
1.確定電纜橋架敷設(shè)路線和支架位置:在進(jìn)行電纜橋架的施工前,需要在設(shè)計(jì)圖紙上標(biāo)注路線和支架位置,并現(xiàn)場清理橋架敷設(shè)路線,以確保敷設(shè)的順暢性和性。
1. Determine the laying route and support position of cable tray: before the construction of cable tray, it is necessary to mark the route and support position on the design drawing, and clean the cable bridge laying route on site to ensure the smoothness and safety of the laying.
2.安裝支架:根據(jù)支架圖紙和實(shí)際情況,安裝支架,支架應(yīng)與地面垂直,支架底部應(yīng)水平。在支架上方的地方安裝固定架等配套構(gòu)件。
2. Installation bracket: Install the bracket according to the bracket drawing and actual situation. The bracket should be perpendicular to the ground and the bottom of the bracket should be horizontal. Install supporting components such as fixing brackets above the bracket.
3.安裝橋架:根據(jù)設(shè)計(jì)圖紙及實(shí)際情況安裝橋架,橋架的長度、高度、寬度應(yīng)符合設(shè)計(jì)要求。當(dāng)安裝徹底時(shí),應(yīng)檢查橋架的平整度、牢固度及其他關(guān)鍵要素。
3. Installation of bridge: Install the bridge according to the design drawings and actual situation. The length, height, and width of the bridge should meet the design requirements. When the installation is complete, the flatness, firmness, and other key elements of the bridge should be checked.
山東電纜橋架
4.固定電纜:電纜橋架安裝完畢后,將電纜固定在橋架上,根據(jù)設(shè)計(jì)圖紙的要求進(jìn)行排列,采用扎帶或其他材料進(jìn)行固定,固定后測試電纜是否松動(dòng)或滑動(dòng)。
4. Fixed cable: after the installation of cable tray, fix the cable on the bridge, arrange it according to the requirements of the design drawing, fix it with ties or other materials, and test whether the cable is loose or sliding after fixing.
5.維護(hù)保養(yǎng):經(jīng)過幾個(gè)月的使用后,需要對電纜橋架進(jìn)行檢查和維護(hù),鐵銹和其他雜質(zhì),并檢查電纜和固定材料是否處于理想的狀態(tài),如有問題要及時(shí)處理。
5. Maintenance: After several months of use, it is necessary to check and maintain the cable tray, remove rust and other impurities, and check whether the cable and fixing materials are in an ideal state. If there is any problem, it should be handled in a timely manner.
總之,電纜橋架的施工需要根據(jù)設(shè)計(jì)要求進(jìn)行,操作者需要有一定的施工經(jīng)驗(yàn),必須嚴(yán)格按照操作規(guī)程進(jìn)行,以確保施工質(zhì)量和性。如果大家需要該產(chǎn)品可以聯(lián)系我們公司http://m.afrolucha.com
In a word, the construction of cable tray shall be carried out according to the design requirements. The operator shall have certain construction experience and must strictly follow the operating procedures to ensure the construction quality and safety. If you need this product, you can contact our company http://m.afrolucha.com 。
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
久人人爽人人爽人人片av| 一本一道久久a久久精品综合色欲 男女啪啪激烈高潮喷出gif免费 | 超碰九九热精品| 欧美国产91| 日韩一区在线| 午夜成人免费在线| 欧美美女一区二区| 插白浆国产在线观看| 欧美激情性久久| 日日碰狠狠躁久久躁96avv| h视频在线免费观看| 国产精品美女久久久浪潮AV| 成人午夜精品| 婷婷亚洲综合色| 777av| 久久99久久精品| 久久婷婷成人综合色综合| 日韩欧美不卡视频| 国产精品一二三| 88久久精品二区| 亚洲精品无码mv在线观看| 日韩一区二区不卡| 激情国产一级无码视频| 色色色综合| 狠狠人妻| 欧美亚洲三级| 久久久久久国际精品| 蜜臀91精品国产高清| 无码一区福利| 啪啪啪啪网站| 丁香五月激情网| 亚洲欧美中文字幕激情视频| 国产精品午夜影院| 初次中出在线观看| 亚洲欧美久久| 男人天堂1区| 欧美偷拍日韩| 国产99大香蕉| 国产久九九| 亚洲综合视频网| 一本久道日本|