山東電纜橋架選擇安裝注意事項(xiàng)

  山東電纜橋架選擇安裝注意事項(xiàng):
  Shandong cable tray selection installation note:
  1.電纜橋架的大載荷、支撐間距應(yīng)小于允許載荷和支撐跨距。
  The maximum load, 1 cable tray support spacing should be less than the allowable load and support span.
  2.橋架的安裝應(yīng)以規(guī)范為準(zhǔn),目前可參照《電纜橋架安裝圖集86SD169》進(jìn)行。橋架在安裝過程中嚴(yán)禁載人,如現(xiàn)場情況確有必要時(shí),必須有保障設(shè)施方可載人,本事項(xiàng)對于不合格或非的操作人員尤為重要。
  2 bridge should be installed in the national standards, the reference to "86SD169" of cable tray installation atlas. Bridge in the installation process is strictly prohibited manned, such as the scene when necessary, must have the safety protection facilities shall be manned, this for the unqualified or non professional personnel is very important.
  3.橋架的立柱、托臂等支架可與基礎(chǔ)預(yù)埋件焊接固定,也可采用膨脹螺栓固定,對于現(xiàn)場焊接處一定要做好防腐處理,通常由用戶現(xiàn)場涂刷防腐漆。
  The column, the bracket can be fixed with 3 bridge welding based embedded parts, also can use expansion bolts, the welding place should be well treated, usually by the user site besmear brushs anticorrosive paint.
  4.電纜橋架水平敷設(shè)時(shí),橋架間的對接處距支承點(diǎn)的距離應(yīng)在跨距的1/4以內(nèi),對于大跨距橋架好放在支承架上對接,在有彎通或三通的地方則需單獨(dú)增加支承點(diǎn),垂直方向的托臂每隔1.5m設(shè)一固定點(diǎn)。
  4 cable bridge horizontal laying, the distance of supporting points should be in 1 / 4 span bridge within the joint between the distance, it is better for large span bridge connection on the supporting frame, were individually increases the supporting point in a general or three place, perpendicular to the direction of the bracket is provided with a fixed interval of 1.5m.
  5.橋架內(nèi)的電纜應(yīng)用電纜卡帶、或金屬電纜卡子進(jìn)行分組固定。對于水平敷設(shè)的電纜通常每隔2m左右作一固定點(diǎn);對于垂直敷設(shè)的電纜應(yīng)每隔1—1.5m固定一次,在改變標(biāo)高的端部也應(yīng)予以固定。
  Cable cable cassette, or metal cable clip 5 group fixed tray. For laying cable level usually every 2m around a fixed point; the cable lifting should be every 1 1.5m fixed time, in the end changes should also be fixed.
  6.電纜橋架按電力施工規(guī)范要求應(yīng)進(jìn)行良好接地,對于鍍鋅電纜橋架無須有專門接地裝置,其本體即可作為接地干線;對于表面進(jìn)行非金屬處理的橋架則必須有專門的接地裝置;橋架的接地線可用VV-16mm2電纜或等截面的銅編織線,該線通常由用戶自備,如由本廠供貨,則應(yīng)在合同中注明,長距離的電纜橋架每隔30—50m接地一次。
  6 cable tray should be a good grounding in electric power construction specifications, for galvanized cable tray without special grounding device, which can be used as a grounding line; for the surface of non metal bridge must have ground special equipment; bridge ground be used VV-16mm2 cable or section of the copper braided wire, the line is owned by the user, such as by the factory delivery, it should be noted in the contract, the long distance cable tray every 30 50m grounding once.
  以上就是山東電纜橋架公司發(fā)布,如果還有什么疑問,歡迎來電咨詢!
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
久久a一本亚洲| av老司机在线| 亚洲人伦乱电影网| 欧美天堂人人爽| 蜜芽成人久久综合| 日韩影片一区| 日韩区av在线| 平邑县| 3pjingpin| 人妻无码中文字幕免费视频蜜桃| 久久久久欧盟成人激情视频| 无码电影你懂的| 乱人伦中文字幕| 菠萝| 国产 日韩 欧美 精品| 日韩电影成人一区二区三区| 亚洲AV无码国产精品午夜福利| 国产精品久久福利网站| 综合色站| 国产精品久久久久久夜夜夜夜夜| SM日韩欧美区二区| 色窝窝无码一区二区三区色欲| 国产轻轻操| 色婷婷狠狠18禁久久| 亚洲男女av| 最新国产欧美一区二区三| 亚洲天堂8| 四虎永久在线精品国产馆V视影院| 大香99一二区| 校园春色综合一区| 免费a级毛片无码专区| 在线播放无码高潮的视频| 婷婷丁香五月婷婷丁香| 五月丁香六月激情综合| 九九热视频| 色图网| 婷婷精品国产亚洲AV小说| 日韩三| 亚洲成A人片在线播放| 蜜桃社| 一本加勒比HEZYO无码人妻|