七七久久,亚洲b在线,一二三四五在线视频,男人扒开女人添高潮的av

網(wǎng)站公告-NOTICE

新聞資訊

當(dāng)前位置:首頁(yè) / 新聞資訊

電纜橋架制造商應(yīng)體現(xiàn)結(jié)構(gòu)簡(jiǎn)單、造型美觀(guān)

  電纜橋架機(jī)械強(qiáng)度高,既有金屬橋的剛性,又有玻璃鋼橋的韌性,耐腐蝕性好,抗老化性能強(qiáng),外形美觀(guān),安裝方便,使用壽命長(zhǎng)。環(huán)氧樹(shù)脂與環(huán)氧樹(shù)脂復(fù)合電纜橋架適用于強(qiáng)腐蝕環(huán)境、大跨度、重載條件。
  The cable tray has the advantages of high mechanical strength, rigidity of metal bridge, toughness of glass steel bridge, good corrosion resistance, strong anti-aging performance, beautiful appearance, convenient installation and long service life. Epoxy resin and epoxy resin composite cable bridge is suitable for strong corrosive environment, large span and heavy load conditions.
  環(huán)氧樹(shù)脂與環(huán)氧樹(shù)脂復(fù)合電纜橋架技術(shù),使玻璃電纜橋架具有結(jié)構(gòu)設(shè)計(jì)合理、工藝、外形美觀(guān)、表面光滑、厚度均勻、機(jī)械強(qiáng)度高、安裝方便、耐腐蝕和耐老化。
電纜橋架
  The composite cable bridge technology of epoxy resin and epoxy resin makes the glass cable bridge have reasonable structure design, advanced technology, beautiful appearance, smooth surface, uniform thickness, high mechanical strength, convenient installation, corrosion resistance and aging resistance.
  特別是大型辦公室、金融、購(gòu)物中心、酒店、體育場(chǎng)館和其他建筑,信息密度,電纜敷設(shè)除了使用地板槽并埋葬在管壁內(nèi),軸和房間天花板上廣泛使用的電纜橋架在天花板上,提供不同的方向布線(xiàn),弱電系統(tǒng)分類(lèi)的各種各樣的橋絲布,更好的路由和安裝方向的要求,結(jié)合結(jié)構(gòu)和空調(diào)的位置,電力和其他管道確定,被動(dòng)和主動(dòng)電纜不能并排電纜敷設(shè),當(dāng)橋在地板上,墻壁或伸縮接頭,相應(yīng)的孔和位置應(yīng)在施工圖紙,以避免臨時(shí)施工鉆孔,這可能損害公民的結(jié)構(gòu)。為了防止電磁干擾(EMC),橋梁設(shè)計(jì)應(yīng)考慮合龍。
  Especially for large offices, finance, shopping centers, hotels, sports venues and other buildings, information density, cable laying in addition to the use of floor trough and buried in the pipe wall, axis and room ceiling widely used cable bridge on the ceiling, providing different directions of wire distribution, weak current system classification of a variety of bridge wire cloth, the best route and installation direction requirements, combined with the structure And the location of air conditioning, power and other pipes determine that passive and active cables cannot be laid side by side. When the bridge is on the floor, walls or expansion joints, the corresponding holes and positions shall be in the construction drawings to avoid temporary construction drilling, which may damage the structure of citizens. In order to prevent electromagnetic interference (EMC), closure should be considered in bridge design.
  橋梁的寬度和高度應(yīng)根據(jù)下表進(jìn)行選擇,并應(yīng)根據(jù)實(shí)際電纜速率進(jìn)行選擇,但不應(yīng)超過(guò)相關(guān)標(biāo)準(zhǔn)規(guī)范的規(guī)定值。電力電纜40-50%,控制電纜50-70%,允許10-25%的開(kāi)發(fā)余量。
  The width and height of the bridge shall be selected according to the following table, and shall be selected according to the actual cable speed, but shall not exceed the values specified in the relevant standards and specifications. 40-50% power cable, 50-70% control cable and 10-25% development allowance are allowed.
 
 
qq
售前咨詢(xún)熱線(xiàn)
15168870138
售后咨詢(xún)熱線(xiàn)
13465410318
日日爱999| 妻av毛片| 欧美熟妇xxx一区二区| 日韩美腿丝袜无码中文字幕| 国产区一区二区三凶精品| 亚洲无码 视频一区 二区| 国产一区二区精品| 日韩国产欧美综合 | 色月| 老司机黄片| 亚洲国在人成线| 泰和县| 南岸区| 丁香七月综合| 武平县| 色婷婷久久| 希乐| 人妻伦一区不卡中文字幕| 国产综合色站| 白嫩少妇欧美亚洲30p| 四房色播五月| 国产骚妇国产骚妻| 97精品在线视频| 亚洲AV无码专区菠萝蜜| 毛色毛片| 一本综合网| 夜色88v精品国产亚洲av小说| 蜜臀在线一区| 精品多人4P无码视频| 久久中文骚妇内射| 亚洲 欧美 内地 日韩 一区| 95久久免精囯产一区二区三区l| 亚洲香蕉频| www中文字幕| 亚洲福利电影| 天干天干天夜夜爽啪av| 国产精品无码V在线观看| 国产精品久久久久一区二区三级片 | 人妻视频在线| 国产日韩欧美17c| 国产成人亚洲欧美二区综合|