電纜橋架電纜是如何有層次的排列
橋架對于一些修建施工的人來說并不生疏,它在咱們的日子中扮演著比較重要的人物,只要合理有序的組織才干更好的確保全體的。那么濟(jì)南電纜橋架上的電纜是怎么有層次的擺放的呢?接下來咱們就為我們做簡略的剖析。
The bridge is not unfamiliar to some people who build it. It plays an important role in our lives. Only a reasonable and orderly organization can better ensure the safety of all. So how does the cable on Jinan cable bridge have layered arrangement? Next let's do a brief analysis for us.
濟(jì)南電纜橋架
Ji'nan cable tray
1.濟(jì)南電纜橋架層次擺放應(yīng)是弱電流操控電纜在上層,接著是一般操控電纜,低壓動力電纜、高壓動力電纜依次往下擺放。這種擺放有利于屏蔽干擾、電力電纜冷卻、便于施工。
1. The layers of Jinan cable bridge should be the top layer of weak current control cable, followed by general control cable, low voltage power cable and high voltage power cable in turn. This arrangement is conducive to shielding interference, power cable cooling and easy construction.
2.各層電纜橋架層間的間隔為:
2. the interval between each cable bridge deck is as follows:
操控電纜≥200mm
Control cable is more than 200mm
動力電纜≥300mm
Power cable is more than 300mm
機(jī)械化敷設(shè)電纜≥400mm
The mechanized laying cable is more than 400mm


注意事項(xiàng):
Matters needing attention:
1.XQJ型電纜橋架設(shè)備的大載荷、支撐間隔應(yīng)小于答應(yīng)載荷和支撐跨距。
The maximum load and support interval of 1.XQJ cable bridge equipment should be less than the promised load and supporting span.
2.挑選電纜橋架的寬度時應(yīng)留有必定的備用空位,以便為往后增加電纜用。
2. when selecting the width of the cable tray, there must be a certain reserve space to increase the cable for the future.
3.當(dāng)電力電纜和操控電纜較少時,可用一電纜橋架設(shè)備,但中心要用隔板將電力電纜和操控電纜離隔敷設(shè)。
3. When there are fewer power cables and control cables, a cable bridge can be used, but the center of the cables and control cables are separated by diaphragms.
4.電纜橋架水平敷設(shè)時,橋架之間的銜接接頭應(yīng)盡量設(shè)置在跨距的1/4左右處.水平走向的電纜每隔2米左右固定一下,垂直走向的電纜每個1.5米左右固定一下。
4. When laying the cable bridge horizontally, the joints between the bridges should be set at about 1/4 of the span as far as possible. Horizontal cable should be fixed every 2 meters, vertical cable should be fixed every 1.5 meters.
5.電纜橋架莊子應(yīng)有牢靠接地。如間隔的電纜橋架每隔30-50米接地一次。
5. cable bridge Chuang-tzu should be firmly grounded. For example, the span of the cable tray will be grounded once every 30-50 meters.
6.電纜橋架設(shè)備除需屏蔽裝保護(hù)罩外,在室外設(shè)備時應(yīng)在其加裝保護(hù)罩,避免日曬、雨淋。對如需焊接設(shè)備時,焊接四周的焊縫厚度不得小于母材的厚度,焊口有必要防腐處理。
6. In addition to shielding protection cover, cable bridge equipment should be installed on the top of the outdoor equipment to avoid sunshine and rain. If the welding equipment is needed, the thickness of the weld around the welding should not be less than the thickness of the base metal, so it is necessary to treat the weld corrosion.
(文章由:濟(jì)南航豐實(shí)業(yè)有限公司提供,對山東電纜橋架感興趣趣的朋友可以關(guān)注我們http://m.afrolucha.com,我們將為您提供新的新聞)
(The article is provided by Jinan Hanfeng Industry Co., Ltd. Anyone who is interested in Shandong cable bridge can pay attention to us at http://m.afrolucha.com. We will provide you with the latest news.)
上一篇:濟(jì)南電纜橋架告訴你安裝規(guī)范
下一篇:電纜金屬橋架如何添加底線
新安县|
超碰日本|
精品人人|
亚洲老熟女一二三|
红原县|
老太奶性BBWBBW免费看|
久久久精品天堂|
色综合二区|
无码AV中文一区二区三区桃花岛|
玖玖资源国产|
九九永久剧情免费专区免费网|
青青毛片|
人妻精品一区二区三区蜜桃|
欧美xxxx69|
无码视频一区二区三区|
少妇人妻在线视频|
WWW284AV免费无码红杏|
蜜臀一区二区|
六月婷婷综合网1|
中文字幕亚洲精品女同一页|
亚洲超碰在线|
囯产精品一区二区三区线一牛影视
|
丰满人妻熟妇乱又伦精品视|
亚洲AV无码乱码在线观看裸奔|
丁香成人免费视频|
超碰线|
一区二区三区日韩欧美深夜九九九|
100部精品久久久久久久久|
亚洲有码区|
欧美三级 欧美一级|
亚洲AV日韩AV色欲AV|
日韩71页|
99综合久久|
东北无码|
无码av一区二区毛片|
狼友在线播放|
国产精品综合久久久久久久免费
|
久久亚洲一区二区|
男人爱看的视频网站日韩|
AV男女网站|
日日嗨aV一区二区三区|
下一篇:電纜金屬橋架如何添加底線
相關(guān)文章 / Recommended news
- 濟(jì)南電纜橋架安裝全流程注意事項(xiàng)解析
- 防火電纜橋架的原理與防護(hù)機(jī)制解析
- 山東電纜橋架承載能力解析
- 鋁合金橋架和不銹鋼電纜橋架該如何選擇?
- 承重不達(dá)標(biāo)的橋架,竟被滿載電纜壓出恐怖凹陷
- 多層橋架散熱差燒穿屋頂?通風(fēng)孔設(shè)計死磕這 2 點(diǎn),火災(zāi)風(fēng)險直降 90%!
- 強(qiáng)電磁干擾下電纜信號丟失,什么橋架能屏蔽干擾?
- 托盤式vs梯式橋架 哪種更適合超高壓電纜
- 山東電纜橋架防鼠突圍戰(zhàn):3種低成本應(yīng)急方案拆解
-
相關(guān)產(chǎn)品 / Related products
安裝橋架安裝橋架安裝橋架防火橋架防火橋架