電纜橋架接地施工要求
電纜橋架的跨接材料應(yīng)按設(shè)計(jì)要求施工。若設(shè)計(jì)沒(méi)有具體要求,應(yīng)按以下要求。
The bridge material of the cable bridge shall be constructed according to the design requirement. If design does not have specific requirement, should press the following request.
a、鍍鋅電纜橋架之間可利用鍍鋅連接板作為跨接線,把橋架連成一體,在連接板兩端的兩只連接螺栓上加鍍鋅彈簧墊圈。

A connection can use galvanized, galvanized cable tray plate as a jumper, put the bridge together as a whole, on two connecting bolt at the ends of the connecting plate and galvanized spring washer.
b、涂漆和噴塑及噴涂其它絕緣物的橋架,應(yīng)采用軟銅線跨接。 跨接用的螺栓應(yīng)鍍鋅,跨接導(dǎo)線端子與橋架接觸處,既要絕緣涂層,還要涂防銹導(dǎo)電膏?;蛭兄圃鞆S在橋架上焊銅墊圈,保證電纜橋架之間跨接可靠。
The bridge of b, painting and spraying and spraying other insulation shall be made of flexible copper wire. The bolted bolts shall be galvanized, and the contact between the terminals and the bridge shall be removed, and the insulating coating shall be cleaned and the rust conductive paste shall be applied. Or entrust the manufacturer to weld the copper washer on the bridge and guarantee the reliability of the cable bridge.
c、橋架經(jīng)過(guò)建筑物變形縫和直線段超過(guò)30m,設(shè)補(bǔ)償裝置處,橋架間斷兩端應(yīng)用軟銅導(dǎo)線跨接,并留有伸縮余量。對(duì)于振動(dòng)場(chǎng)所,在接地部位的連接處應(yīng)裝置彈簧圈。
C, the bridge is over 30 meters in the shape of the deformation of the building and the line segment, and the compensator is located, and the bridge is intersecting with the flexible copper conductor at the end of the bridge, and there is a retractable residual amount. For vibrations, the spring coil should be installed at the connection of the ground.
橋架系統(tǒng)應(yīng)具有可靠的電氣連接,電纜橋架從始端到終端,少有一處與接地干線可靠連接。沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。
The bridge system should have reliable electrical connection, the cable bridge is from the beginning to the terminal, at least one is connected to the ground main. Each section (including non-linear segment) bridge should have at least one reliable connection to the grounding line when the bridge is all over the ground.
鍍鋅橋架之間可利用鍍鋅連接板作為跨接線,把橋架連成一體。在連接板兩端的兩只連接螺栓上加鍍鋅彈簧墊圈,橋架之間用不小于4mm2軟銅線進(jìn)行跨接,再將橋架與接地線相連,形成電氣通路。橋架整體與接地干線應(yīng)有不少于兩處的連接。
Zinc-plated bridge can be used to connect the bridge with the galvanized connection plate. On two connecting bolt at the ends of the connecting plate and galvanized spring washer, bridge between was not less than 4 soft copper wire jumper, then bridge connected to the grounding wire, electrical pathway. There should be no less than two connections between the total and ground trunk of the bridge.
若設(shè)計(jì)要求把橋架作為接地干線的一部分,則要求遵守電纜橋架安裝規(guī)范在接頭處的連接電阻不應(yīng)大于0.00033Ω。若利用橋架連接板達(dá)不到這個(gè)要求,即使是鍍鋅橋架,也應(yīng)用符合設(shè)計(jì)要求的軟銅導(dǎo)線跨接。
The bridge if design requirements as part of the grounding line, is for the cable tray installation specification in connection joint should not be greater than 0.00033 Ω resistance. If the bridge board is not able to reach this requirement, even the galvanized bridge is applied to the flexible copper wire that meets the design requirements.
上一篇:對(duì)于電纜橋架的選購(gòu)有什么技巧
下一篇:防火電纜橋架與普通橋架區(qū)別表現(xiàn)
无码天堂av|
久久久久久香蕉|
日韩性爱一区|
希乐|
人人妻人人澡人人爽精品|
久久精品私人影院免费看|
九色人妻97|
久久老色|
珠海市|
国产v片在线观看|
蜜桃a|
五月天丁香久久综合网|
抠逼视频|
超碰1996|
房色四播|
久久天堂导航|
亚洲精品久久久久久久久久久久|
久久夜夜综合片|
欧美精品167页|
求av网址|
蜜桃成熟期|
国际精品久久久|
我和黑人|
a 天堂在线|
无码AV中文一区二区三区桃花岛|
一本久久综合网|
av每日更新|
麻豆久久|
亚洲国产成人久久一区二区三区|
日韩精选 欧美|
人妻人人澡人人添人人爽|
久久久久久久久久99精品|
美日韩一区二区|
欧美熟女色图|
久久久久那么毛片|
一本久|
久久久久久毛片精品|
五月丁香五月激情|
亚洲天堂无码日韩|
河北熟女91|
蜜桃久久AV无码精品一区二区|
下一篇:防火電纜橋架與普通橋架區(qū)別表現(xiàn)
相關(guān)文章 / Recommended news
- 濟(jì)南電纜橋架安裝全流程注意事項(xiàng)解析
- 防火電纜橋架的原理與防護(hù)機(jī)制解析
- 山東電纜橋架承載能力解析
- 鋁合金橋架和不銹鋼電纜橋架該如何選擇?
- 承重不達(dá)標(biāo)的橋架,竟被滿載電纜壓出恐怖凹陷
- 多層橋架散熱差燒穿屋頂?通風(fēng)孔設(shè)計(jì)死磕這 2 點(diǎn),火災(zāi)風(fēng)險(xiǎn)直降 90%!
- 強(qiáng)電磁干擾下電纜信號(hào)丟失,什么橋架能屏蔽干擾?
- 托盤(pán)式vs梯式橋架 哪種更適合超高壓電纜
- 山東電纜橋架防鼠突圍戰(zhàn):3種低成本應(yīng)急方案拆解
-
相關(guān)產(chǎn)品 / Related products
安裝橋架安裝橋架安裝橋架防火橋架防火橋架